A buyer who asks for "the whole house to stay on when the grid fails" is asking for a larger inverter, a larger LiFePO4 battery, and a higher chance that the first quotation will not hold. In many homes and small commercial sites, that is not the design they actually need. What they need is a short list of essential loads that must remain on, and a clear place to connect them.
Several CHUHAN hybrid inverters provide more than one AC output. The ACT-VX-10K 10.2 kW single-phase hybrid, for example, has a main AC output and a second AC output on the connection panel, next to the PV and battery terminals. The ACT INV6500-48 6.5 kW unit is also listed with dual AC output, and it can be paralleled up to nine units when a site needs to grow. Those second outputs are not a cosmetic extra. They are how you keep backup honest.
Start with a load split, not a promise to run everything
Before you size the inverter, divide the site into three groups:
- Essential: lighting in key rooms, refrigeration, internet and security, a medical device if there is one, and a limited number of sockets.
- Deferrable: laundry, dishwashers, and other loads that can wait until the grid returns or until solar is strong.
- High-power: air conditioning, electric water heating, workshop machines, and any EV charger.
Only the first group should sit on the backup output unless you have measured the peak and have the battery to match it. Write the split into the quote. If the customer later insists on whole-house backup, you can enlarge the system with numbers in hand, instead of discovering the gap during an outage.
This split works in more than one setting. In a family home, it usually means a small essential board for an evening outage. In a home workshop, it means tools stay off backup while lights, a fridge, and a network router stay on. In a small shop or office, it may mean tills, lighting, and communications stay up, while air conditioning is left off or is limited.
What the second AC output is for
On a hybrid inverter, the main output often feeds the normal house or site loads while the grid is present. The second output is the place to attach a critical-load panel that remains powered from the battery when the grid drops. Used this way, the inverter does not have to carry every appliance at once, and the installer has a clean boundary for wiring and for testing.
If a unit also supports parallel operation, such as the INV6500-48, you still start with the same split. Parallel capacity is for a later increase in power, not a reason to skip the essential-load list on the first job.
How this changes battery size and the EV charger
Inverter rating is power (kW). Battery capacity is energy (kWh). The second output only helps if the essential list and the backup hours are in the same conversation.
A 7 kW, 11 kW, or 22 kW AC wallbox is often the largest single load on a residential or workplace quote. Putting it on the backup bus can empty a home LiFePO4 tower in a short time and can overload a single-phase hybrid inverter if other essential loads are also running. For most homes, the practical rule is: keep the EV charger on the non-backup side, or agree a reduced charge rate during an outage, and write that into the quotation.
The same logic applies to a depot or small commercial site. Overnight AC charging at a workplace can stay on the grid or on a scheduled tariff. A high-power DC charger should not be assumed to run from a residential-size battery during a grid failure.
What to send with the enquiry
When you ask CHUHAN to help close a hybrid-plus-storage quote, include:
- Single-phase or three-phase supply at the main board
- A draft essential-load list, with approximate power of each item
- How many hours of backup the customer expects for that list
- Whether an EV charger or other high-power load must run during an outage
- Whether the site may later add solar, storage, or parallel inverters
CHUHAN manufactures hybrid and off-grid inverters, LiFePO4 storage, and AC and DC EV chargers in our factory in Yueqing, Zhejiang. If you share the load split above, we can help you match the inverter, the battery, and the charger so the backup you sell is the backup the site can actually deliver.
Website: https://www.chinachuhan.com/
Email: sales03@chinachuhan.com
WhatsApp: +86 189 6895 8968
